Aqmos R2d272 Installation Verified -

Aqmos R2d272 Installation Verified -

: Must be between 2.0 and 6.0 bar. If pressure exceeds 6 bar, a pressure reducer is mandatory. 2. Physical Installation Steps Follow these steps to physically connect the system:

: Attach the stainless steel hoses to the bypass. Ensure flat seals are correctly placed in the connections.

Before starting, ensure your installation site meets the following verified criteria: aqmos r2d272 installation verified

: Turn off the main water supply and drain the lines.

: Secure the wastewater hose to the system's drain port with a hose clamp and lead it to your drain system. : Must be between 2

: Tighten these connections hand-tight initially to allow for adjustment before final tightening.

Ensuring your is verified and functioning correctly is essential for maintaining a limescale-free home. This guide provides a comprehensive walkthrough for a successful setup of the water softener. 1. Site Preparation and Requirements Physical Installation Steps Follow these steps to physically

Once connected, the electronic must be configured:

: Requires a standard 230V/50Hz electrical socket nearby.

: An open drain or wastewater connection (12 mm) must be accessible for regeneration.